Non-standard automation

Dc brushless motor assembly line

无刷电机布局图.png

图片231.png

OP10: double-shaft pressure loading machine, double-layer transmission line station
OP20: Carbon brush and shaping manual group
OP30: Long bolt and rear cover assembly station
OP40: front automatic locking screw machine installation station
OP50: side automatic nut screw machine
OP60: Reserve manual front and side lock screw stations
OP70: Automatic no-load and high-voltage test equipment, plus silent room
OP80: Manually operated load test equipment and lock nut station
OP90: Laser marking equipment
OP100: manual blanking table with labeling, line drawing, packing
OP110: double speed chain return line

Contact

Welcome To Call

Contact:Mr. Xu

Phone:13861322446/18112559280

Tel:0512-65440252-808

E-mail:gh_x@szpfct.com

Add:3rd floor, 2nd building of No.,11, Chunhui Road, SIP